APC Smart-UPS commands
din niste notite vechi, ca sa nu se piarda…
| command | meaning |
| Y | enter “smart” mode |
| U | simulate power failure |
| D | start calibration cycle (works only if battery charge considered 100%) |
| W | perform self-test |
| E | set automatic self-test interval |
| B | query battery voltage |
| f | query battery charge level, % |
| j | query estimated runtime on battery |
| P | query load ratio (current load to unit’s rated max load) |
| C | query internal temperature |
| L | query input voltage |
| O | query output voltage |
| M | query max line voltage since unit reset |
| N | query min line voltage since unit reset |
| l (lowercase L) | set lower admissible line voltage |
| u | set upper admissible line voltage |
| e | set battery charge level prior to powering the load |
| r | set wakeup delay |
| s | set unit sensitivity (high/medium/low) |
| q | set “low battery” signaling level, in estimated runtime minutes |
| o | set lowest battery admissible voltage |
| p | set shutdown delay (time since UPS shutdown command) |
| n | queries some number (unit serial?) |
| G |
queries cause of last transfer to batteries. returns:
|
| X |
query self-test result. returns:
|
vote:@echo off
rem replace COM1 with your relevant com port number
net stop ups
mode COM1 baud=2400 parity=n data=8 stop=1 to=off xon=off dtr=off rts=off idsr=off
echo D>COM1
net start ups
December 16th, 2008 at 04:45
I Have just replaced Battery in my Smart-UPS 1000,but Battery Led are flashing.
How to do normal ups?
thanks
Reply
vv reply on December 22nd, 2008:
charge it to the maximum, then calibrate.
repeat about 5 times.
Reply
November 29th, 2009 at 15:53
Right now how much WITH tax and all is your iphone plan and if you will state if you have the 59, 79, 99, 119 dollar plan. Thanks, im planning on getting one when the new iphone is released in a week or two..
________________
unlock iphone 3g
Reply